Project Tasks
Yasser Al-Aqabi Professional Consulting Company has implemented this project in cooperation with the National Center for Environmental Compliance Control in Makkah Al-Mukarramah Region, for a plan to correct environmentally damaged sites and correct the environmental situation at the power generation station site in Durrat Al-Arus Resort, north of Jeddah Governorate, as one of the qualified and accredited entities by the National Center for Environmental Compliance Control. Based on the inspection visit by specialists from the Environmental Inspection Department at the Center’s branch in Makkah Al-Mukarramah Region, at the aforementioned site, which is Durrat Al-Khaleejiya Maintenance and Operation Company Limited, specifically at the Durrat Al-Arus power generation station site.
Corrective plan objectives
Identifying the causes of pollution Soil pollution in the area of diesel-powered power generators. As well as pollution resulting from leaks of petroleum materials, fuel and oils as a result of operating work, is one of the types of environmental pollution that negatively affects the environment and public health.
Implementing procedures to correct the environmental situation in the area of soil pollution resulting from leakage at the site and preparing a report on the environmental situation of the site after the completion of environmental correction work on the site and conducting environmental measurements.
Project Location
Saudi Arabia
Project Type
Environmental Studies
Client
National Center for Environmental Compliance – Makkah Region
Project Period
January 2024 – June 2024