Project Tasks
As per hydrological studies prepared by Saudi Geological Survey Authority for previous municipalities, as well as for activating these studies physically in order to save both humans and properties, therefore, this project included signage of valleys routes on the ground and partitioning the same to 15,000 partition. preparing executive designs of linear and width sectors for maintaining the routes of these valleys from aggression as well as facilitating its execution on the ground.
Project Location
Al Lith, Saudi Arabia
Project Type
In the field of urban planning, Survey and roads
Client
Jeddah Governorate Municipality
Project Period
18 Months